![](https://www.treverlen.org.uk/wp-content/uploads/2019/01/Treverlen-Trees-cropped-1024x694.jpg)
Suddenly, just 4 weeks since the old building on the site was demolished, a whole new atmosphere exists. From one side there is still the dust bowl as the rubble is sifted, sorted and shifted – with about 400 cubic metres to be retained as hard core for surfaces. The dust is a white-out at times even with heavy water spraying.
Meanwhile, on the west side, trees in some numbers have been planted which will give them a good start for the spring. Behind the trees, the ground is being prepared for more works – some very flat ground, contrasted to grand heaps of rubble.